• Three-phase electricity 36kVA
  • soft water
  • purified water
  • Steam clean 100kg / hr
  • Clean and dry compressed air
  • Water / hot water
  • Water thermostat (+ 4 ° C to + 121 ° C)
FAT
SAT
factory acceptance test